Plan failure... big time...
‘Instant’ bridge aims to make a dangerous crossing safer for thousands of studentsMiami Herald › 5 days ago

Instant bridge? Not quite, but in a single morning Florida International University dropped a new elevated pedestrian span into place over the Tamiami Trail to provide students a safe route over the perilous roadway for the first time.
Once it’s finished in early 2019, the new pedestrian bridge will link FIU’s Modesto A. Maidique Campus directly to the small suburban city of Sweetwater, where the university estimates 4,000 of its students live.
The rapid span installation was the result of months of preparation. The bridge’s main 174-foot span was assembled by the side of the Trail while support towers were built at either end.

The 950-ton span was then picked up, moved and lowered into place by special gantry cranes at the intersection of Southwest 109th Avenue in an operation that lasted several hours Saturday morning. A section of the Trail, also designated as Southwest Eighth Street, was closed to traffic Friday evening for the bridge installation, and will remain shut until 5 a.m. Monday.
...more at linkhttps://firenewsfeed.com/news/1266293